by Rex Mason » Wed Nov 20, 2013 4:46 pm
Being going slow but steady. The glass shelves have arrived and I've built the brackets and everything for them. Still need to dust the shelves and put them up, but right now, I'm concentrating on painting. The room is really big (21 by like 25 or 26 feet), and it was bright orange, so I'm in the process of covering that up with a gray primer and then a dark gray finished coat. The figure wall is done completely, and the rest of the room is pretty much coated in primer, so tonight after work I'm going to start with the final coat of paint. Probably get that done in two or three days, as I'm only down there about two or three hours tops each night. We also put up drywall in the closet so I could store all my non-figure Batman tubs in there until I have a proper place to display them.
After that, I can hanging pictures on the wall (I've got a great framed 1989 Batman puzzle (of the movie poster) to put up, as well as a few original comic book pages and the like) and can start moving furniture where it belongs. And then finally, it's unpacking the figures. Very much looking forward to that part.
I'm actually going to order six new glass shelves as I'll be able to fit eight rows of figures on the wall without it looking crowded. I'm thinking I can actually display all my figures on that one wall if that works out.